Hardy/Upham Projects: Design concepts and diagrams

 

The School Building Committee SBC voted to recommend Hardy option 7b, with conditions, as the preferred schematic option at their meeting on 9/24/20. The main conditions were to evaluate the site for opportunities to reduce the amount of retaining walls and improve site circulation on option 7b.

UPHAM SITE OPTIONS

The Hardy/ Upham School projects have begun design concepts for both the Hardy and Upham School sites. SMMA presented the original Long List Options  at the December 05, 2019 School Building Committee meeting.  Click the Long List options link to view the site plan alternatives.

HARDY SITE OPTIONS

© 2019 Town of Wellesley School Building Committee

525 Washington Street, Wellesley MA 02482

Hardy progress floor plan2_210211