Hardy/Upham Projects: Design concepts and diagrams

 

The School Building Committee SBC voted to recommend Hardy option 7b, with conditions, as the preferred schematic option at their meeting on 9/24/20. The main conditions were to evaluate the site for opportunities to reduce the amount of retaining walls and improve site circulation on option 7b.

2020 10 22 SBC 7b.2 slides
2020 10 22 SBC 7b.2 slides

press to zoom
Hardy progress floor plan1_210211
Hardy progress floor plan1_210211

press to zoom
Hardy progress floor plan2_210211
Hardy progress floor plan2_210211

press to zoom
2020 10 22 SBC 7b.2 slides
2020 10 22 SBC 7b.2 slides

press to zoom

UPHAM SITE OPTIONS

020 09 17 HU Community Forum Upham.jpg
020 09 17 HU Community Forum Hardy.jpg

The Hardy/ Upham School projects have begun design concepts for both the Hardy and Upham School sites. SMMA presented the original Long List Options  at the December 05, 2019 School Building Committee meeting.  Click the Long List options link to view the site plan alternatives.

HARDY SITE OPTIONS