The School Building Committee SBC voted to recommend Hardy option 7b, with conditions, as the preferred schematic option at their meeting on 9/24/20. The main conditions were to evaluate the site for opportunities to reduce the amount of retaining walls and improve site circulation on option 7b.
2020 10 22 SBC 7b.2 slides
Hardy progress floor plan1_210211
Hardy progress floor plan2_210211
2020 10 22 SBC 7b.2 slides
UPHAM SITE OPTIONS
The Hardy/ Upham School projects have begun design concepts for both the Hardy and Upham School sites. SMMA presented the original Long List Options at the December 05, 2019 School Building Committee meeting. Click the Long List options link to view the site plan alternatives.