​Hunnewell Project: Work to date

​

The School Building Committee evaluated and concluded a feasibility study from April 2018 to July 2019. The Hunnewell school project evaluated the critical site investigations including a site survey, wetlands flagging, traffic study, Geotechnical soil borings on the existing site. The project engineers also evaluated the existing conditions of the school building. The results of those investigations are included in the subconsultant reports that are included as an appendix to the Feasibility Study Report. 

​

The SBC concluded the feasibility study for the Hunnewell school project in July 2019. A copy of the report can be downloaded in the Milestone Submissions page.  